skip to main | skip to sidebar

The T3 Track

T3 track or Technical Torture Trail will link the top of Vertigo and the top of Trickle Falls. The track will be two-way and is designed to be grade 5 techical downhill and a grade 5-6 technical uphill. The track will contain between 16 and 18 manmade and natural obstacles along the way. The track will hopefully be something that people can hone their skills on and attack with the attitude of "I'll clear it this time"

Tuesday, March 11, 2008


Posted by Makara Peak Supporters at 7:40 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Do you enjoy riding T3, Up or Down?

Blog Archive

  • ►  2009 (2)
    • ►  February (1)
    • ►  January (1)
  • ▼  2008 (9)
    • ►  September (2)
    • ▼  March (5)
      • T3 Is Now Open To All Riders!!Thanks to Maxxis an...
      • No title
      • No title
      • T3 Map
      • Jonathan and I have come up with a new game.To be ...
    • ►  February (1)
    • ►  January (1)
  • ►  2007 (9)
    • ►  May (6)
    • ►  April (1)
    • ►  February (2)
  • ►  2006 (5)
    • ►  October (2)
    • ►  September (3)

Links

  • Makara Peak Supporters
  • Kennett Bros
  • NZ Mountain Bike

About Me

My photo
Makara Peak Supporters
View my complete profile